Plastic Formwork for Concrete Slab

Product Details
Customization: Available
After-sales Service: Online
Warranty: 1 Year
Still deciding? Get samples of US$ 10/Piece
Request Sample
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (17)
  • Plastic Formwork for Concrete Slab
  • Plastic Formwork for Concrete Slab
  • Plastic Formwork for Concrete Slab
  • Plastic Formwork for Concrete Slab
  • Plastic Formwork for Concrete Slab
  • Plastic Formwork for Concrete Slab
Find Similar Products

Basic Info.

Certification
ISO, ROHS, CE, Patent Certificate;SGS
Material
PP/Polypropylene
Type
Wall Formwork
Formwork Size
58*58*15cm
Weight of Formwork
1.78kg
Color
Customized
Model No.
Tpcsdf
Application
Hotel, Public Structures (Schools, Hospitals, etc)
Transport Package
225PCS/Pallet
Specification
58*58*15cm
Trademark
TOPO NEW
Origin
China
HS Code
3926100000
Production Capacity
10000/Month

Product Description

Classic Construction Pipe PVC+ Plastic Formwork for Building
Product Name Concrete Plastic Formwork Crawl Space Formwork
Material PP
Color Customized Color
Product Advantages
  1. STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVETOR.
  2. LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross-section is approximately equal to the thickness of the upper slab.
  3. HIGH LOAD BEARING: Countless pillars, arches, and domes create the highest load-bearing structure.
  4. VOID n SPACE: The void space created under NEW ELEVETOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
  5. FAST: When compared to traditional systems, it guarantees faster installation times of up to 80% (with respect to the use of traditional inert materials).
  6. SAVINGS: NEW ELEVETOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.   
Application Building Construction
Plastic Formwork for Concrete Slab
Typical technical data of TPDVF system:

Plastic Formwork for Concrete Slab

Advantages of Revak System

The air cavity formed by the Revak System modules must be connected to the outside with simple pipes. This creates a natural airflow that crosses the cavity and eliminates moisture and Radon gas (if present).

1. Reduction of manpower requirements by up to 80% in comparison to traditional systems.

2. Drastic reduction in the use of concrete and aggregates as the arch form permits maximum resistance with a minimum thickness.

3. Possibility to implement, in a single solution, foundation beams and the slab with the help of the L-Plast accessories.

4. Adaptable to non-standard spaces as the modules can be cut without underpinning.

5. Ease of positioning due to lightness and simple linking of the modules.

6. Simple adaptation to various perimeters.

7. Quick and immediate cutting and shaping of the modules.

8. Passage of the underground systems in every direction.

9. Creation of a barrier against humidity.

10. Tightness against rising humidity.

11. Effective ventilation in all directions.

12. Disposal of any RADON gas.

13.No points of contact between the concrete and the ground.

14. Perfect transpiration of the perimeter wall.

Plastic Formwork for Concrete Slab
Plastic Formwork for Concrete SlabPlastic Formwork for Concrete SlabPlastic Formwork for Concrete SlabPlastic Formwork for Concrete SlabPlastic Formwork for Concrete Slab
Plastic Formwork for Concrete Slab
Plastic Formwork for Concrete Slab

Are you trading company or manufacturer?

We are manufacturer.

 

About Sample?

Few samples can be offered per your request.

 

About Material Color?

We can make the material to your appointed color according to Pantone/RAL#.


How does your factory control the quality?
Quality is the Priority, we always pay great importance to quality from beginning to end, and we have professional QC for item quality from spare parts to finished goods.

 

 How many days for mass production?

20 days after all artwork and 30% deposit are confirmed.
 

 How can I get the samples? is the sample free? 

7-10 days to send free samples by DHL, TNT, and UPS.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier