High Load Bearing Faster Installation Formwork

Product Details
Customization: Available
After-sales Service: Online
Warranty: 1 Year
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (17)
  • High Load Bearing Faster Installation Formwork
  • High Load Bearing Faster Installation Formwork
  • High Load Bearing Faster Installation Formwork
  • High Load Bearing Faster Installation Formwork
  • High Load Bearing Faster Installation Formwork
  • High Load Bearing Faster Installation Formwork
Find Similar Products

Basic Info.

Model NO.
PP Formwork
Certification
ISO, ROHS, CE, Patent Certificate;SGS
Material
PP/Polypropylene
Type
Slab Formwork
Transport Package
Customized
Specification
58*58*15cm
Trademark
TOPO NEW
Origin
China
HS Code
3925900000
Production Capacity
10000/Month

Product Description

High Load Bearing Faster Installation Formwork

High Load Bearing Faster Installation Formwork
High Load Bearing Faster Installation Formwork
High Load Bearing Faster Installation Formwork
Product Name

TOPO Crawl Space Disposable Formwork (TPCSDF)

Material PP
Color Customized Color
Product Advantages
  1. STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVETOR.
  2. LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross section is approximately equal to the thickness of the upper slab.
  3. HIGH LOAD BEARING: Countless pillars, arches and domes create the highest load bearing structure.
  4. VOID n SPACE: The void space created under NEW ELEVETOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
  5. FAST: When compared to traditional systems, it guarantees faster installation times up to the 80% (in respect to the use of the traditional inert materials).
  6. SAVINGS: NEW ELEVETOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.   
Application Building Construction

Concrete Typical Technical Data of TPDVF System                                                                  

High Load Bearing Faster Installation Formwork

High Load Bearing Faster Installation Formwork


High Load Bearing Faster Installation Formwork
High Load Bearing Faster Installation Formwork
High Load Bearing Faster Installation Formwork
High Load Bearing Faster Installation FormworkHigh Load Bearing Faster Installation FormworkHigh Load Bearing Faster Installation Formwork
Packing and Delivery                                                                                                          

High Load Bearing Faster Installation Formwork

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier