Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors

Product Details
Customization: Available
After-sales Service: Online
Warranty: 2 Years
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (17)
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
  • Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
Find Similar Products

Basic Info.

Model NO.
Construction Formwork
Certification
ISO
Material
Plastic
Type
Slab Formwork
After-Sale Service
Online Technical Support
Color
Customized
Usage
Construction
Transport Package
Customized
Specification
58*58*15cm
Trademark
TOPO NEW
Origin
China
HS Code
3925900000
Production Capacity
10000/Month

Product Description

Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
Product name Disposable Formwork for the construction of ventilated foundations
Color Customized Color
Product advantages

1. Solved the problems of radon and humidity;

2. Compared with traditional construction methods, the installation speed is increased by 80 (compared to traditional concrete pouring);   

3. Compared with the use of traditional building materials, the system can save money, especially in transportation and installation;

4. The height and size of the template in the TPDVF system can be adjusted as required to suit your design;

5. Allows easy installation of pipes and other facilities within the created void space.    

Applications Building Construction
Product size

Our general specifications are 50cm*50cm, height (3, 6, 9, 13, 15, 17, 20, 25, 27, 30, 35, 40, 45, 50, 55, 60, 65, 70) cm, we can also be customized according to customer requirements.

Product Material pp
Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors 
Typical technical data of TPDVF system:

Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors

Advantages of Revak System:

The air cavity formed by the Revak System modules must be connected to the outside with simple pipes. This creates a natural airflow that crosses the cavity and eliminates moisture and Radon gas (if present).

1. Reduction of manpower requirements by up to 80% in comparison to traditional systems.

2. Drastic reduction in the use of concrete and aggregates as the arch form permits maximum resistance with a minimum thickness.

3. Possibility to implement, in a single solution, foundation beams and the slab with the help of the L-Plast accessorise.

4. Adaptable to non-standard spaces as the modules can be cut without underpinning.

5. Ease of positioning due to lightness and simple linking of the modules.

6. Simple adaptation to various perimeters.

7. Quick and immediate cutting and shaping of the modules.

8. Passage of the underground systems in every direction.

9. Creation of a barrier against humidity.

10. Tightness against rising humidity.

11. Effective ventilation in all directions.

12. Disposal of any RADON gas.

13.No points of contact between the concrete and the ground.

14. Perfect transpiration of the perimeter wall.

Construction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors

Construction Formwork Stay-in-Place Forms to Create Aerated Concrete FloorsConstruction Formwork Stay-in-Place Forms to Create Aerated Concrete FloorsConstruction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
Construction Formwork Stay-in-Place Forms to Create Aerated Concrete FloorsConstruction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors
Construction Formwork Stay-in-Place Forms to Create Aerated Concrete FloorsConstruction Formwork Stay-in-Place Forms to Create Aerated Concrete Floors

Are you a trading company or manufacturer?

We are manufacturer.

 

About Sample?

Few samples can be offered per your request.

 

About Material Color?

We can make the material to your appointed color according to Pantone/RAL#.


How does your factory control the quality?
Quality is the Priority, we always pay great importance to quality from beginning to end, and we have professional QC for item quality from spare parts to finished goods.

 

 How many days for mass production?

20 days after all artwork and 30% deposit are confirmed.
 

 How can I get the samples? Is the sample free? 

7-10 days to send free samples by DHL, TNT, and UPS.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier