Concrete Plastic Formwork Crawl Space Formwork

Product Details
Customization: Available
After-sales Service: Online
Warranty: Online
Still deciding? Get samples of US$ 10/Piece
Request Sample
Diamond Member Since 2020

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
to see all verified strength labels (17)
  • Concrete Plastic Formwork Crawl Space Formwork
  • Concrete Plastic Formwork Crawl Space Formwork
  • Concrete Plastic Formwork Crawl Space Formwork
  • Concrete Plastic Formwork Crawl Space Formwork
  • Concrete Plastic Formwork Crawl Space Formwork
  • Concrete Plastic Formwork Crawl Space Formwork
Find Similar Products

Basic Info.

Model NO.
Construction Formwork
Material
PP/Polypropylene
Type
Slab Formwork
Formwork Size
58*58*15cm
Weight of Formwork
1.78kg
Color
Customized
Model No.
Tpcsdf
Application
Hotel, Public Structures (Schools, Hospitals, etc)
Transport Package
225PCS/Pallet
Specification
58*58*15cm
Trademark
TOPO NEW
Origin
China
HS Code
3926100000
Production Capacity
10000/Month

Product Description

Concrete Plastic Formwork
Concrete Plastic Formwork Crawl Space Formwork
Concrete Plastic Formwork Crawl Space Formwork
Concrete Plastic Formwork Crawl Space Formwork
Product Name Concrete Plastic Formwork Crawl Space Formwork
Material PP
Color Customized Color
Product Advantages
  1. STACKABLE: Unmatched logistical advantages when transporting and storing. At a height of 50 cm, conventional filling requires 50 trucks of filling in comparison to only 1 truck of NEW ELEVETOR.
  2. LIGHTNESS: By far it is the lightest filling solution; the total weight of the cross-section is approximately equal to the thickness of the upper slab.
  3. HIGH LOAD BEARING: Countless pillars, arches, and domes create the highest load-bearing structure.
  4. VOID n SPACE: The void space created under NEW ELEVETOR allows an easy installation of electrical as well as mechanical systems. The void space is also perfect to ventilate damp and RADON GAS away from the building.
  5. FAST: When compared to traditional systems, it guarantees faster installation times up to 80% (with respect to the use of traditional inert materials).
  6. SAVINGS: NEW ELEVETOR system allows savings compared to the use of traditional inert materials, especially in terms of transport and installation.   
Application Building Construction


Concrete Typical Technical Data of TPDVF System                                                                  


Concrete Plastic Formwork Crawl Space Formwork

Concrete Plastic Formwork Crawl Space Formwork


Concrete Plastic Formwork Crawl Space Formwork
Concrete Plastic Formwork Crawl Space Formwork
Concrete Plastic Formwork Crawl Space Formwork
Concrete Plastic Formwork Crawl Space FormworkConcrete Plastic Formwork Crawl Space FormworkConcrete Plastic Formwork Crawl Space Formwork
Packing and Delivery                                                                                                          


Concrete Plastic Formwork Crawl Space Formwork

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier